colored balls

Soil Sampling

Characterization and Sampling Options

what's new What's New?
blank gif
features Features
blank gif
links Links
blank gif
resources Resources
blank gif
globe-related GLOBE-Related
blank gif
soil science basics Soil Science Basics
blank gif
soil & society Soil & Society
blank gif
Soil and the env. Soil & the Environment
blank gif
working with soil Working with soil
blank gif
soil & students Soil & Students
blank gif
soil & agriculture Soil & Agriculture
blank gif
Index Index
blank
Home Home

Soil Pit

Dig a soil pit at least 1 meter deep and as big around as is necessary to easily observe all of the soil horizons from the bottom to the top of the pit.


Exposed Profile (road cut)

Use a road cut, excavation site, or other location where the top 1 meter of soil has been exposed.

soil pit

road cut

Auger

Use an auger to remove soil samples to a depth of 1 meter.

Surface Sample

Use a garden trowel or shovel to sample only the top 10 cm of soil, if digging to a depth of 1 meter is not possible.

auger

surface sample

line

Back to ToC

Top

 

Back to Soil Science Education Home Page


Webmaster: Izolda Trakhtenberg, izolda@ltpmail.gsfc.nasa.gov
Information Contact: Izolda Trakhtenberg, izolda@ltpmail.gsfc.nasa.gov
Responsible Civil Servant: Dr. Elissa Levine, globe@ltpmail.gsfc.nasa.gov
NASA's Goddard Space Flight Center
Last Updated: September 17, 2001

globe-related basics agriculture resources